Section 02220-Excavation and Backfill

Section 02220-Excavation and Backfill

Section 02220-Excavation and Backfill - Valparaiso Utilities

02220.doc Revised 1/07 1 SECTION 02220 EXCAVATION, BACKFILLING, AND COMPACTING PART 1 - GENERAL 1.01 WORK INCLUDED A. Excavation, backfilling, and compaction for sanitary sewer pipelines, service lines, manholes and incidental construction. 1.02 RELATED WORK A. Section 02575 - Pavement Repair B. Section 02605 - Manholes

Get a Quote

SECTION 02210 GENERAL EXCAVATION 02210.01 GENERAL

SECTION 02220 STRUCTURE EXCAVATION 02220.01 GENERAL A. Description 1. Structure excavation shall include, but not necessarily be limited to excavation for bridges, drainage structures, retaining walls, and building foundations as shown on the Plans and in accordance with the Contract Documents. 2.

Get a Quote

Excavating, Backfilling & Compacting | Midvale, UT

7. Section 01500 – Temporary Facilities and Controls 8. Section 02255 – Bedding, Backfill, and Embankment Materials 9. Section 02370 – Geotextile 10. Section 02220 – Site Demolition 11. Section 01140 – Contractor's Use of Premises C. Referenced Standards: 1. American Society for Testing and Materials (ASTM) a.

Get a Quote

02210 - TRENCHING, BACKFILLING AND COMPACTION OF …

Oct 28, 2019 · SECTION 02220 EXCAVATION AND BACKFILL PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment and incidentals required to perform all excavating, backfilling, filling and grading, and disposing of earth materials as shown, specified, and required for construction of structures,

Get a Quote

02220-1 of 9 SECTION 02220 STRUCTURE EXCAVATION …

SECTION 02314 EXCAVATION, BACKFILL AND FILL FOR STRUCTURAL FACILITY AND UTILITY SYSTEMS PART 1 - GENERAL 1.01 SCOPE OF WORK: A. The work included under this Section consists of furnishing material and equipment, and performin g al l labor nec ess ary for excav ati ng, bac kf illing, filling and compa cti on of area s to be

Get a Quote

INDEX SECTION 02220 - EARTHWORK, DAMS 1.2 QUALITY

SECTION 02220 May 2020 EARTHWORK, DAMS 02220 - 1 INDEX SECTION 02220 - EARTHWORK, DAMS PART 1 - GENERAL 1.1 DESCRIPTION 1.2 QUALITY ASSURANCE used by Contractor, this additional excavation and backfilling shall be completed at no additional cost to Division. C. The final core trench dimensions shall be measured jointly by Contractor and

Get a Quote

R,OY F, WE StON; I NC

SECTION 01566 EROSION AND SEDIMENT CONTROL. PART 1 GENERAL 1.01 RELATED WORK SPECIFIED ELSEWHERE. A. Section 02200: Earthworks B. Section 02220: Excavation and Backfill for Force Main 1.02 DESCRIPTION A. Work Includes: Furnish all labor, equipment, and materials needed to complete the work as shown on the drawings and specified herein. B.

Get a Quote

SOUTHWEST REGIONAL WATER DISTRICT

02220-1 February 2016. SECTION 02220 . BACKFILLING . PART 1 GENERAL . 1.01 WORK INCLUDED . A. Backfilling and compaction requirements . 1.02 RELATED WORK . A. Section 02215 - Excavation . B. Section 02221 - Trenching . 1.03 REFERENCES . A. ANSI/ASTM C136 - Sieve Analysis of Fine and Coarse Aggregates. B. ODOT Item 613, Type 1 . PART 2 PRODUCTS

Get a Quote

INDEX SECTION 02220 - EARTHWORK, DAMS 1.2 QUALITY

SECTION 02220 May 2020 EARTHWORK, DAMS 02220 - 1 INDEX SECTION 02220 - EARTHWORK, DAMS PART 1 - GENERAL 1.1 DESCRIPTION 1.2 QUALITY ASSURANCE used by Contractor, this additional excavation and backfilling shall be completed at no additional cost to Division. C. The final core trench dimensions shall be measured jointly by Contractor and

Get a Quote

Part 1 General 1.1 DESCRIPTION OF WORK

The Manitoba Water Services Board SECTION 022190 Standard Construction Specifications STRUCTURAL EXCAVATION, Revised May 2015 BACKFILL AND COMPACTION Page 1 of 10 Part 1 General 1.1 DESCRIPTION OF WORK .1 This work shall consist of the removal of all materials of whatever nature,

Get a Quote

SECTION 02220 EXCAVATION, BACKFILLING, AND …

Excavating, Backfilling & Compacting | Midvale, UT

Get a Quote

EXCAVATION, TRENCHING AND BACKFILLING FOR UTILITIES

02220-1 EXCAVATION, TRENCHING AND BACKFILLING FOR UTILITIES 1.0 GENERAL 1.1 SCOPE This section provides for excavation, trenching and backfilling for storm sewers, sanitary sewers, water distribution mains, and other utility systems and appurtenances. 1.2 RELATED WORK ˜˜a. Division 2, Site Work. (1) Sanitary Sewers (2) Cement-Sand Backfill

Get a Quote

02245-1 of 3 SECTION 02245 SELECTED BACKFILL 02245.01 …

1. Protection of the environment; Section 01500. 2. Structure excavation; Section 02220. 3. Trench excavation, backfill, and compaction; Section 02250. C. Quality Assurance All selected backfill material will be subject to test by the Engineer to determine the material's compliance with these Specifications. D. Submittals

Get a Quote

02220 - Excavation, Backfill and Fill for Structures

Section 02220 Revised 1/2021 1 SECTION 02220 EXCAVATION, BACKFILLING, AND COMPACTING PART 1 - GENERAL 1.01 WORK INCLUDED A. Excavation, backfilling, and compaction for sanitary sewer pipelines, service lines, manholes and incidental construction. 1.02 RELATED WORK A. Section 02575 - Pavement Repair B. Section 02605 – Manholes

Get a Quote

DIVISION 2 SITEWO RK TABLE OF CONTENTS

section no. title 02010 soil investigation 02020 cavity probing 02060 demolition 02072 minor demolition for remodelling 02110 clearing and grubbing 02167 reinforced earth 02200 earthworks 02210 compaction and testing of earthwork 02220 structural excavation and backfill 02221 trenching, backfilling, compaction and general grading

Get a Quote

B. Coordination: CONTRACTOR shall carefully coordinate

Oct 28, 2019 · Section 02220, Excavation and Backfill. 2. Section 02370, Erosion and Sedimentation Control 3. Section 03300, Cast-In-Place Concrete. 4. Section 02610, Pipe and Fittings 1.2 QUALITY ASSURANCE A. Installer ¶s Qualifications and Experience: 02400- 23 1. Installer shall be a specialist in the construction of casing pipes by

Get a Quote

STANDARD SEWER SPECIFICATIONS AND DETAILS FOR …

SECTION 02220 EXCAVATION AND BACKFILL PART 1: GENERAL 1.01 SCOPE OF WORK A. GENERAL 1. The work covered by this Section shall consist of furnishing all materials, labor, equipment, and services for the excavation and backfill at all areas within the limits of the project. Work is limited to

Get a Quote

CITY OF DOUGLAS, WYOMING

Section 02220 – Trench Excavation A. Paragraph 3.03, ADD the following s paragraph 3.03.D: "The traffic control requirements are supplemented in the Contract Documents in Section

Get a Quote

B. Coordination: CONTRACTOR shall carefully coordinate

Oct 28, 2019 · Section 02220, Excavation and Backfill. 2. Section 02370, Erosion and Sedimentation Control 3. Section 03300, Cast-In-Place Concrete. 4. Section 02610, Pipe and Fittings 1.2 QUALITY ASSURANCE A. Installer ¶s Qualifications and Experience: 02400- 23 1. Installer shall be a specialist in the construction of casing pipes by

Get a Quote

SECTION 02220 EARTHWORK - Chattanooga

SECTION 02220 EARTHWORK PART 1 - GENERAL 1.01 SCOPE A. This specification section includes earthwork and related operations, including, Material for backfill or for protection of excavation in public roads from surface drainage shall be neatly placed and kept shaped so as to cause the least possible interference with public travel. Free

Get a Quote
Copyright © Talenet Group all rights reserved